ADA Aluminum Walkway Project — Fall/Winter 2026
/Plans are underway to replace the existing bridge with a new ADA-compliant aluminum walkway during the fall/winter of 2026.
The project will include a 5-foot-wide, 23-foot-long aluminum gangway, new hinge hardware, HDPE skid pads, H-post stringers, concrete anchor pads, composite side rails, and stainless-steel barriers designed to accommodate golf cart traffic.
The project also includes:
Removal of the existing bridge.
Installation of the new ADA walkway and supporting components.
Two 2' × 6' × 24" concrete anchor pads.
Delivery and installation of all materials.
The work is currently planned for fall/winter 2026.