ADA Aluminum Walkway Project — Fall/Winter 2026

Plans are underway to replace the existing bridge with a new ADA-compliant aluminum walkway during the fall/winter of 2026.

The project will include a 5-foot-wide, 23-foot-long aluminum gangway, new hinge hardware, HDPE skid pads, H-post stringers, concrete anchor pads, composite side rails, and stainless-steel barriers designed to accommodate golf cart traffic.

The project also includes:

  • Removal of the existing bridge.

  • Installation of the new ADA walkway and supporting components.

  • Two 2' × 6' × 24" concrete anchor pads.

  • Delivery and installation of all materials.

The work is currently planned for fall/winter 2026.